top of page

ROADMAP

(LAST UPDATED: 24/12/2020)

Disclaimer. Time slots are a rough estimate with the extremely high chance of dates moving and changing as priorities change.   (Q1=Jan-Mar, Q2=Apr-Jun, Q3=Jul-Sep, Q4=Oct-Dec)

Brackets indicate project developed with a partner:
WW= Wayside Works
JRS = Jordans Rail Simulator

SGS = SG Simulations
STY = Steaming Through Yorkshire
CAM = Cambriana

BLS = British Locomotive Studios

W1500 = Wandering 1500

LAUNCH TITLES:

ROUTES:

MID NORFOLK PHASE 1

​

​

RESKINS:

BR CLASS 04 TRAMWAY PACK (WW)

​

​

​

PLANNED FOR 2021

ROUTES:

Q1: IPSWICH DOCKYARDS

Q2: NORTH NORFOLK RAILWAY (W1500)

Q2: MID NORFOLK PHASE 2 (BLS)

Q3: WISBECH AND UPWELL TRAMWAY

Q3: BRESSINGHAM STEAM MUSEUM (WW)

Q4: BITTERN LINE (SGS)

​

RESKINS:

Q1: HASTINGS DEMU 

Q1: BR CLASS 41 HST-P (WW)

Q2: WD AUSTERITY 2-10-0 (WW)

Q2: MNR STOCK PACK (JRS, BLS)

Q2: NNR STOCK PACK (WW, CAM)

​

SCENARIOS:

Q1: IPSWICH DOCKYARD PACK (STY)

Q2: NNR PACK (STY)

Q2: MNR PACK (BLS)

Q3: WISBECH AND UPWELL TRAMWAY PACK (STY)

Q3: BRESSINGHAM PACK (STY)

Q4: BITTERN LINE PACK (STY)

Q4: WEYBOURNE WANDERER PACK

NO SET DATE

ROUTES:

2 SECRET SOLO ROUTE PROJECTS

SECRET PARTNER ROUTE PROJECT

MID NORFOLK PHASE 3 

MID NORFOLK BACKDATED

WISBECH AND UPWELL BACKDATED

​

​

RESKINS:

SECRET RESKIN PROJECT

​

SCENARIOS:

SCENARIO PACKS FOR ALL SECRET ROUTE PROJECTS

UNCONFIRMED

IN ADDITION TO ALL THE ABOVE, WE HAVE 9 MORE SECRET PROJECTS THAT HAVE BEEN PLANNED FOR BUT ARE NOT CURRENTLY CONFIRMED. MOST OF THESE ARE DEPENDENT ON THE RELEASES OF OTHER 3RD PARTY DEVELOPERS

bottom of page