ROADMAP
(LAST UPDATED: 24/12/2020)
Disclaimer. Time slots are a rough estimate with the extremely high chance of dates moving and changing as priorities change. (Q1=Jan-Mar, Q2=Apr-Jun, Q3=Jul-Sep, Q4=Oct-Dec)
Brackets indicate project developed with a partner:
WW= Wayside Works
JRS = Jordans Rail Simulator
SGS = SG Simulations
STY = Steaming Through Yorkshire
CAM = Cambriana
BLS = British Locomotive Studios
W1500 = Wandering 1500
LAUNCH TITLES:
ROUTES:
MID NORFOLK PHASE 1
​
​
RESKINS:
BR CLASS 04 TRAMWAY PACK (WW)
​
​
​
PLANNED FOR 2021
ROUTES:
Q1: IPSWICH DOCKYARDS
Q2: NORTH NORFOLK RAILWAY (W1500)
Q2: MID NORFOLK PHASE 2 (BLS)
Q3: WISBECH AND UPWELL TRAMWAY
Q3: BRESSINGHAM STEAM MUSEUM (WW)
Q4: BITTERN LINE (SGS)
​
RESKINS:
Q1: HASTINGS DEMU
Q1: BR CLASS 41 HST-P (WW)
Q2: WD AUSTERITY 2-10-0 (WW)
Q2: MNR STOCK PACK (JRS, BLS)
Q2: NNR STOCK PACK (WW, CAM)
​
SCENARIOS:
Q1: IPSWICH DOCKYARD PACK (STY)
Q2: NNR PACK (STY)
Q2: MNR PACK (BLS)
Q3: WISBECH AND UPWELL TRAMWAY PACK (STY)
Q3: BRESSINGHAM PACK (STY)
Q4: BITTERN LINE PACK (STY)
Q4: WEYBOURNE WANDERER PACK
NO SET DATE
ROUTES:
2 SECRET SOLO ROUTE PROJECTS
SECRET PARTNER ROUTE PROJECT
MID NORFOLK PHASE 3
MID NORFOLK BACKDATED
WISBECH AND UPWELL BACKDATED
​
​
RESKINS:
SECRET RESKIN PROJECT
​
SCENARIOS:
SCENARIO PACKS FOR ALL SECRET ROUTE PROJECTS
UNCONFIRMED
IN ADDITION TO ALL THE ABOVE, WE HAVE 9 MORE SECRET PROJECTS THAT HAVE BEEN PLANNED FOR BUT ARE NOT CURRENTLY CONFIRMED. MOST OF THESE ARE DEPENDENT ON THE RELEASES OF OTHER 3RD PARTY DEVELOPERS